TM 1-1520-265-23
Change 3 2-29
2.14.3.3 Access. Access to the pitch control rods is from the L/R engine cowl (Figure 1-4, Items
3T-7 and 4T-8).
2.14.3.4 Preparation of Part. The part shall be thoroughly cleaned. Refer to Preparation of Part
or Area for NDI, paragraph 1.4.4.
2.14.3.5 NDI Equipment Settings.
a. Make the following initial settings on the Eddy Current Inspection Unit, NORTEC-19eII.
Frequency F1
- 1500 KHz
F2
- off
HdB
- 56.0
VdB
- 74.0
Rot
- 57_
Probe drive
- mid
LPF
- 100
HPF
- 0
H Pos
- 80%
V Pos
- 20%
b. Refer to Eddy Current Method, paragraph 1.4.11. Set up on test block as follows:
(1) .Null probe on test block.
(2) .Adjust phase as required to obtain horizontal lift-off.
(3) .Move probe over all three notches in test block. Adjust gain to obtain a three block vertical
signal when probe is passed over 0.040-inch notch in test block. (See the standard
instrument display shown in Figure 1-7.)
2.14.3.6 Inspection Procedure. Refer to Eddy Current Method, paragraph 1.4.11 and Figure 2-14.
a. Place probe on a good area in the inspection location and null. Adjust phase as required to
obtain horizontal lift-off.
b. Inspect the part.
c. Any signal similar to the notches in the test block are cause for rejection.
NOTE
Either probe identified in paragraph 2.14.3.1 may be used depending primarily on the
ease of accessibility and user friendliness. If the probes are changed, steps 2.14.3.5
b. (1), (2), and (3) shall be repeated each time a change is made.