0070 00TM 1-6625-724-13&P0070 00-12TASK 3 - BALANCE MAIN ROTOR - INITIAL PROCEDURE 1: PREPARATION Perform task 2, Flat Track Main Rotor on the Ground.PROCEDURE 2: PERFORM INITIAL MEASUREMENTa. Use cursor keys to highlight Aircraft Type, then press DO.b. Use cursor keys to highlight aircraft type based on table 2, then press DO.c. Tail Number is highlighted. Press DO.d. Use cursor keys to highlight a tail number used in task 2, then press DO.e. Flight Plan is highlighted. Press DO.f. Use cursor keys to highlight INITIAL. Press DO.g. Enter the Measure mode by pressing F1. Verify that Test State IDLE is highlighted.h. Press DO when the aircraft is stable at the highlighted selection. Re-verify that the aircraft is at the requiredTest State (IDLE, FPG100, or Hover) and press DO again. Perform this operation each time a measurement iscompleted and another Test State is highlighted. The AVA will acquire track and vibration data at each TestState and then return to the selection menu.i. After the last measurement is completed, press DO on Finish, then press DO on Diagnostics. If measurementsare within specified limits, press QUIT to Main Menu and perform task 4, Track Main Rotor In Flight.j. If measured values exceed specifications, press DO to calculate a solution. Evaluate the improvementsobtainable through recommended corrections. Perform all corrections as shown, ensuring that you display allscreens of a multiple screen solution.k. Do not use a partial set of adjustments. If changes to the recommended corrections are desired, use the EditAdjustables and Edit Defaults options. The AVA will calculate a new set of corrections, use view predictions tocompare the new set of adjustments to the default solution to ensure the vibration is being reduced. Use all ofthe new corrections.l. After corrections are installed, take the measurements again to verify improvements.m. After more than one measurement has been taken, trend flights to verify if the hover lateral vibration is beingreduced.PROCEDURE 3: PITCH LINK ADJUSTMENTSNOTEWhen adjusting the pitch link on the AH-1SS, turn asshown in figure 8 and count flats/turn at the specifiedlocation.a. Turn barrel the specified amount displayed on the CADU.b. Verify corrections by completing another ground run at 100% Nr, flat pitch.c. Make appropriate logbook entry on the pitch control links and balance weighs that were changed, if any.Figure 8. Pitch Link
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business