0074 00TM 1-6625-724-13&P0074 00-4TASK 1 - TEST EQUIPMENT INSTALLATION/CHECKOUTFigure 1. Typical AVA Test Setup ConfigurationPROCEDURE 1: EQUIPMENT INSTALLATIONa. Remove AVA blade tracking equipment from transport case. Check for possible damaged equipment andfrayed cables. Figure 1 is the typical AVA test setup configuration.b. Install DAU (29328201) in the canvas carrying case.c. Place DAU in the back seat with the connectors facing up and secure DAU using lap and shoulder belts andcanvas straps and D-rings.d. Connect the UH-1 DC power adapter cable (29312800), figure 2, to the heater blanket receptacle and to the10-ft power cable (29104700).e. Connect power cable to the DAU receptacle marked 28 Vdc.f. Install CADU (29313107) in aircraft. Connect CADU to DAU cable (29325601) to CADU and to DAU receptaclemarked CADU.ACC1(Lat)ACC2(Vert)ACC4(Tail)TACHO 1