TASK 1 - TEST EQUIPMENT INSTALLATION/CHECKOUT
Figure 1. Typical AVA Test Setup Configuration
PROCEDURE 1: EQUIPMENT INSTALLATION
a. Remove AVA blade tracking equipment from transport case. Check for possible damaged equipment and
frayed cables. Figure 1 is the typical AVA test setup configuration.
b. Install DAU (29328201) in the canvas carrying case.
c. Place DAU in the back seat with the connectors facing up and secure DAU using lap and shoulder belts and
canvas straps and D-rings.
d. Connect the UH-1 DC power adapter cable (29312800), figure 2, to the heater blanket receptacle and to the
10-ft power cable (29104700).
e. Connect power cable to the DAU receptacle marked 28 Vdc.
f. Install CADU (29313107) in aircraft. Connect CADU to DAU cable (29325601) to CADU and to DAU receptacle
marked CADU.
ACC1 (Lat)
ACC2 (Vert)
ACC4 (Tail)
TACHO 1