TM 1-1520-265-235.4.3.5NDI Equipment Settings.a.Make the following initial settings on the Eddy Current Inspection Unit, NORTEC-19e11Frequency F1- 200 KHzF2- offHdB- 57.0VdB- 69.0Rot- 56°Probe drive -midLPF- 100HPF- 0H Pos- 80%V Pos-20%b.Refer to Eddy Current Method, paragraph 1.4.11. Set up on test block as follows:(1)Null probe on test block.(2)Adjust phase as required to obtain horizontal lift-off.(3)Move probe over all three notches in test block. Adjust gain to obtain a three block vertical signal whenprobe is passed over 0,040-inch notch in test block. (See the standard instrument display shown inFigure 1-7.)5.4.3.6Inspection Procedure. Refer to Eddy Current Method, paragraph 1.4.11 and Figure 5-4.Figure 5-4. Air Inlet Assembly and Bleed-Air Exhaust Slots5-7
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business