TM 1-1520-265-232.9.3.6Inspection Procedure. Refer to Eddy Current Method, paragraph 1.4.11 and Figure 2-9.a.Place probe on a good area in the inspection location and null. Adjust phase as required to obtain horizontal lift-off.b.Inspect the part.c.Any signal similar to the notches in the test block are cause for rejection.NOTEEither probe identified in paragraph 2.9.3.1 may be used depending primarily on the ease ofaccessibility and user friendliness. If the probes are changed, steps 2.9.3.5 b. (1), (2), and (3)shall be repeated each time a change is made.2.9.3.7Marking and Recording of Inspection Results . Mark and record inspection results as required byparagraph 1.3.2.9.4 BackupMethod. None required.2.9.5 SystemSecuring. The droop stop support ring nut, if removed, requires installation in accordance with theapplicable technical manuals listed in Table 1-1.ARROWS INDICATE SCAN PATHSFigure 2-9. Droop Stop Support Ring Nut2-18
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business