TM 1-1520-265-23Change 3 2-11Figure 2-6. M ain Rotor Hub2.6.3.7 Marking and Recording of Inspection Results. Mark and record inspection results asrequired by paragraph 1.3.2.6.4 BackupMethod. Fluorescent Penetrant, refer to paragraph 1.4.7.2.6.5 SystemSecuring. The main rotor hub, if removed, requires installation in accordance withthe applicable technical manuals listed in Table 1-1.2.7 SPINDLE (ET).2.7.1 Description (Figure 2-7, Index No. 7). The spindle couples the blade to the main rotor head.The main rotor head contains four spindle assemblies.2.7.2Defects. The inspection is used to verify crack indications found visually on the spindle. Nocracks are allowed.2.7.3Primary Method. Eddy Current.2.7.3.1 NDI Equipment and Materials. (Refer to Appendix B.)a. Eddy Current Inspection Unitb. Probe, straight, shielded surface, 2 MHzc. Probe, right angle, shielded surface, 2 MHz, 90_ 1/2 inch drop,