TM 1-6625-724-13&P0075 000075 00-15m. Identify each accelerometer cable and route the cables from the accelerometers forward along the hydraulic linesto the forward tunnel cover. Pass the cables under tunnel cover in the forward cabin door to the DAU andconnect as follows:DAU ChannelAccel. LocationACC1Forward Transmission Oil CoolerACC2H/B#1ACC3H/B#2ACC4H/B#3n. Tie-wrap the accelerometer cables clear of all rotating components and flight controls.
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business