TM 1-6625-724-13&P0019 000019 00-1/(0019 00-2 blank)UNIVERSAL TRACKING DEVICE (UTD)INSPECTION AND FAULT ISOLATIONInitialSetup:Workbench with ESD capabilityPersonnelRequired:TMDE Support SpecialistToolsandEquipment:As listed in TM 1-6625-736-13&P, NSN 6625-01-347-8667 P/N 29085800References:Operator’s Manual for Test Set, Electronic NSN 6625-01-347-8667EquipmentCondition:AVA system on workbench, DAU cover removed and connected to test set.a. Examine UTD for visible damage. Replace items that are broken. See appropriate work packages for removaland installation procedures.b. Connect the DAU to the test set following instructions in the Operator’s Manual for Test Set, Electronic,Section V-Calibration paragraph 2-11 (2) SETUP.c. Perform Operator’s manual instructions Section V-Calibration, paragraph 2-11 (1) PROGRAM THE CADU, ifnot previously accomplished.d. Perform Operator’s manual instructions Section V-Calibration, paragraph 2-11 (5) UTD Test.e. If no errors are reported, verify UTD values in Table 2-1, UTD Expected Output. If values are outside oftolerance given, open UTD, inspect and replace PWA as outlined in WP 0051-001/2.f. Repeat steps b. through f.END OF WORK PACKAGE
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business