TM 1-6625-724-13&P
0020 00
0020 00-1/(0020 00-2 blank)
AVIATION UNIT MAINTENANCE
REPAIR PARTS, SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
AVIATION VIBRATION ANALYZER
Index
General ............................................................................................................................................................................. 1
Maintenance Operations .................................................................................................................................................. 1
Tools and Test Equipment List......................................................................................................................................... 1
Special Tools, TMDE and Support Equipment................................................................................................................. 1
Repair Parts...................................................................................................................................................................... 1
1. GENERAL
This chapter contains maintenance procedures that are the responsibility of the aviation unit maintenance technician
as authorized by the Maintenance Allocation Chart (MAC) and Source Maintenance and Recoverability (SMR) coded
items in the Repair Parts and Special Tools List (RPSTL). The maintenance procedures in this chapter are prepared
in the form of summary and detailed procedures.
2. MAINTENANCE OPERATIONS
These instructions provide the proper technique and detailed procedures required to perform the maintenance
operations. Each maintenance operation provides step-by-step instructions in the order in which the work is most
logically accomplished. Any unusual or critical steps are covered in detail.
3. TOOLS AND TEST EQUIPMENT LIST
Tools and test equipment required for maintenance of AVA are identified in the MAC work package. For authorized
common tools and equipment refer to the Modified Table of Organization and Equipment (MTOE) applicable to your
unit.
4. SPECIAL TOOLS TMDE AND SUPPORT EQUIPMENT
There are no special tools required for test or inspection procedures at the AVUM level.
5. REPAIR PARTS
Repair parts are listed in WP 0061 00 of this manual.
END OF WORK PACKAGE